When you are going to start your carrier as a Site Engineer, you are following some points.
- Don't be over smart in front of your senior.
- Communicate with them politely or simply.
- Contractor wants to know your character by asking your senior, so be careful.
- Give respect to your senior.
- If the contractor goes to site, then discuss with him about the work or site problem.
- As you are a site engineer you must know the function of auto level.
- Take a diary/pocket book with pen on your site always
- Before going to site planned well, so that minimize the mistakes.
- Take all drawings with a water proof file.
- You have to take work permit for starting the work everyday.
- Always do the work with safety.
- Always follows the PPEs at site when you are going to work.
- If you are working at a particular height that means above the 1.8m you must use the safety belt and handled ladder.
- Check the checklist of machineries and tools which are used in your work daily or weekly.
- When you are on site conduct a TBT(Tool Box Talk) for 2 min.
- TBT means awareness of hazards of materials and works to the workers.
- Do the work as per drawings.
- If any changes on your site then take a third party sign on the drawings, which is better for billing.
- If any extra work is done which is not mentioned in drawings, then that is enter in JMR and which is signed by Consultants/Clients.
- Try to Completed your work within given time.
- Marking the site as per drawings.
- Take excavation permit also to start the excavation work, because if the site has any wires, cables & pipeline under the earth where you will excavate.
- If more than 2m depth, excavation is done then provide a slope of 1:4.
- Provide a working space of 2m away from the excavation.
- Clear the excavated soil from site if it is not possible, then damp around it with a spacing of 1.5m.
- Always give proper BBS as per drawings.
- Always check proper levels, reinforcements, cover and formwork before casting.
- If you get any mistakes, then don't casting at first correct it then casting the structure.
- Test the concrete before casting by slump test.
- Always take pour card at the time of casting.
- Vibrate properly during casting. because it give more strength and avoids the honeycomb in that structure.
- After casting check again levels.
- Don't remove the formwork of vertical structure before 24 hours.
- After the work finish all material remove and stack at one place.
- Housekeeping to be done at every site.
- Hard barrication to be done before leave the site if construction is under process.
- Use the sign boards also if that is the running way.
- Report to your senior if any material is shortage.
- Always note down the quantity of materials availabl in your store room.
- If more sites are running and the material shortages then don't start the work with a few material it is more time taken and which is loss for your company.
Hiiii friends I think this is helpful to u